Steel prices in Europe were flat in mid-October 2026: according to the Fastmarkets index, hot-rolled coil (HRC) in Northern Europe stood at 745 EUR/t ex-works on 15 October, while SteelOrbis reported on 16 October that cold-rolled coil (CRC) was trading at around 850-860 EUR/t and hot-dip galvanised coil (HDG) at 840-850 EUR/t ex-works. This is a mid-October snapshot: full-month data is not yet available, and some indicators (PMI, steel output) refer to September. Compared with the end of September, the price of steel per tonne has moved by only a few euros, but the balance of power in the market has shifted. Mills are holding their offers: Q4 import quotas in the key categories were exhausted on 6 October, and several plants in Europe are idle. On the other side are weak demand and high stocks at buyers.
Data: Fastmarkets via EUROMETAL (15.10.2026), S&P Global Platts via EUROMETAL (7.10.2026), European Commission (5.10.2026), worldsteel Short Range Outlook (12.10.2026).
Steel prices in mid-October 2026
Hot-rolled coil in Northern Europe is moving within a narrow range. The Fastmarkets index for HRC ex-works Northern Europe stood at 741.67 EUR/t on 12 October and 745 EUR/t on 15 October, up 6.67 EUR/t on a month earlier. According to Fastmarkets, the market leader was selling in North-West Europe on 15 October at 760 EUR/t delivered, which nets back to 740 EUR/t ex-works after freight, with deals done in the 740-760 EUR/t ex-works range.
In Italy, the Fastmarkets index stood at 743.75 EUR/t on 15 October (+7.92 EUR/t month on month), so the gap between northern and southern Europe has all but disappeared. The reason lies in supply problems in the south, described below.
According to SteelOrbis (16 October), cold-rolled and galvanised sheet prices have barely moved over the past two weeks. Mills in Italy and Northern Europe are offering CRC at 850-880 EUR/t ex-works, and in parts of the EU as high as 890-920 EUR/t, with transaction prices at around 850-860 EUR/t. HDG offers stand at 850-870 EUR/t, in isolated cases 880 EUR/t, while deals are being closed at 840-850 EUR/t ex-works.
Steel coil prices in Europe, October 2026 (EUR/t)
| Product and market | Price level | Date | Change |
|---|---|---|---|
| HRC, Northern Europe, ex-works (Fastmarkets index) | 745 | 15.10.2026 | +6.67 m/m |
| HRC, Italy, ex-works (Fastmarkets index) | 743.75 | 15.10.2026 | +7.92 m/m |
| CRC, Italy and Northern Europe, ex-works, transactions | 850-860 | 16.10.2026 | virtually unchanged for 2 weeks |
| HDG, Italy and Northern Europe, ex-works, transactions | 840-850 | 16.10.2026 | virtually unchanged for 2 weeks |
| HRC import, CIF Antwerp (Platts) | 595 | 7.10.2026 | - |
| CRC import, DDP, incl. CBAM costs (SteelOrbis) | 870-890 | 16.10.2026 | - |
Source: EUROMETAL via Fastmarkets (13.10 and 16.10.2026), SteelOrbis (16.10.2026) and S&P Global Platts (7.10.2026).
The comparison with September should be read with caution, as the previous review was based on assessments from a different agency. According to McCloskey by OPIS, on 25 September HRC in North-West Europe was assessed at around 750 EUR/t ex-works, CRC at 860 EUR/t and HDG at 845 EUR/t. In mid-October, levels are similar. Full September data and the wider background are covered in our steel market review for September 2026.
In mid-October, the spread between cold-rolled and hot-rolled sheet is around 105-115 EUR/t (HEN-STOL calculation: CRC transaction price of 850-860 EUR/t according to SteelOrbis on 16.10 minus the Northern Europe HRC index of 745 EUR/t according to Fastmarkets on 15.10; data from two different agencies).
Q4 import quotas exhausted within days
The new safeguard mechanism, in force since 1 July 2026 under Regulation (EU) 2026/1384, provides for an annual duty-free tariff quota of 18,345,922 t and a 50% duty on imports above the quota. Quotas are allocated quarterly. The Q4 period opened on 1 October and, according to European Commission data reported by SteelOrbis (5.10) and S&P Global Platts (7.10), several key pools were already empty by 6 October:
- HRC (category 1A): the “other countries” pool and Turkey's quota (160,573 t) exhausted; according to SteelOrbis, 378,822 t of Turkish material was awaiting customs clearance on 5 October.
- CRC: the “other countries” pool (24,934 t) exhausted, while South Korea still had 89.38% of its allocation left.
- HDG (category 4A): the “other countries” pools (33,339 t), Japan and Taiwan exhausted; in category 4B, the quotas for China and Turkey.
In practice, imports from these origins will either pay the 50% duty until the end of the year or wait for the next quarter. According to Fastmarkets, the import market was very quiet in the week to 15 October: Indian offers at 750-770 USD/t CFR found no takers, as India's quota is almost used up. A European trader quoted by SteelOrbis on 4 October said he was giving up on HRC imports, as Indian and Turkish suppliers had already sold large volumes for Q1 2027 and a scramble for quota space is looming.
Until 30 June 2027, unused volumes carry over to the next quarter. The current implementing regulation only allocates quotas up to 31 December 2026, so the January-June 2027 allocation requires a new Commission act.
Melt and pour from 1 October: what has changed at the border
Since 1 October 2026, importers of products covered by the mechanism have had to declare at customs clearance the country where the steel was melted and poured (melt and pour). Implementing Regulation (EU) 2026/1963 names the mill test certificate (Mill Test Certificate) showing the country of melt and the heat number as the primary evidence. Where the certificate is missing or incomplete, customs may accept other documents, including invoices, long-term supplier declarations or customs documents from the exporting country. Until 30 September 2027 these may replace the certificate, but customs officers verify them, which can delay access to the quota. Without a declaration backed by evidence, the goods will be refused.
CBAM: certificate price rising, settlement in 2027
On 5 October, the European Commission published the CBAM certificate price for Q3 2026: 82.32 EUR per tonne of CO₂. That is 7.04 EUR (9.4%) more than in Q2 (75.28 EUR). The Q4 price will be announced on 4 January 2027, and certificates will be available for purchase on the common platform from February 2027.
CBAM costs are already priced into import offers. According to Fastmarkets, Egyptian hot-rolled coil was offered in the week to 15 October at 750 USD/t CFR, including 25-30 USD/t for CBAM. Imported CRC, mainly from South Korea, cost 870-890 EUR/t DDP including CBAM costs according to SteelOrbis (16.10), which is above transaction prices for sheet from European mills. The mechanism and settlement rules are explained in our article on CBAM and steel tariffs in 2026.
Supply: outages at Italian mills
Prices are being supported mainly by tight supply, not by demand. According to Fastmarkets (13 and 15 October), the former Ilva plants are due to idle their hot end (blast furnaces and steel shop) until 28 October, Ferriera Valsider (Metinvest) is offering only small volumes for December after a production break, and one hot rolling line is down at Arvedi. In Germany, the Eisenhüttenstadt works restarted blast furnace 5A on 6 October, after it had been shut down on 25 September. A trading source quoted by Fastmarkets on 13 October claims that some Northern European mills have almost filled their Q4 order books, which suppliers have not confirmed.
Demand: weak in Europe, slightly better sentiment in Poland
In its Short Range Outlook of 12 October 2026, the World Steel Association cut its forecast for the EU. Steel consumption is expected to fall by 0.3% in 2026, to 146.3 million t, 1.5 percentage points less than assumed in April. In 2027 it is forecast to grow by 3.1%, to 150.8 million t. According to worldsteel, the 2025 figure was inflated by stockpiling ahead of the CBAM launch, construction is recovering more slowly than expected and the automotive sector continues to drag demand down. The rebound from 2027 is expected to be driven by spending on infrastructure and defence and by investment in energy and rail.
Market reports paint the same picture. According to Fastmarkets (13 October), distributors and processors in Northern Europe are fully stocked, while in Italy buyers are reluctant to commit to larger volumes and longer lead times. Kallanish (17 October) describes a similar situation in France: mills are pushing for higher sheet prices, while service centres are struggling to pass the increases on to their customers.
In Poland, the manufacturing PMI (S&P Global, published on 1 October) rose to 49.0 points in September from 48.3 points in August. This still signals deteriorating conditions, for the seventeenth month in a row, but output, new orders and employment fell at a slower pace. Two findings from the report matter for the steel market. Companies' stocks of materials rose for the second month running, for the first time since May 2022. Suppliers' delivery times lengthened significantly, though less than in August.
Winter outlook: what the data shows
None of the institutions reviewed publishes a numerical forecast of sheet prices for winter 2026/2027, so the factors that will drive prices are set out below rather than a specific price level.
What this means for winter sheet purchasing
For a manufacturing plant, the conclusion is simple: in winter 2026/2027 the market points neither to a clear fall nor to a spike in prices, but material availability may be less predictable than price. It pays to plan purchases for December and Q1 2027 in advance, before mills allocate their volumes, rather than when stock is running low. For non-EU imports, the CFR price comes with the risk of above-quota duty, CBAM costs and delays in document verification. How to split requirements across quarters is covered in more detail in our article on the steel market in the second half of 2026 and purchase planning.
Steel sheet from HEN-STOL
HEN-STOL is a wholesale supplier of steel sheet without mill certificate, meaning material sold without a certificate from the mill: galvanised, cold-rolled and hot-rolled sheet in coils, slit strip and cut sheets. Galvanised sheet is available in thicknesses of 0.30-6.00 mm, in grades including DX51D-DX56D and S220GD-S550GD, with coatings from Z100 to Z430, ZM, AZ and others. Cold-rolled sheet comes in thicknesses of 0.30-5.00 mm (DC01, DC02, DC04, DC05, DC06, HC180LA-HC550LA, DP450-DP980), and hot-rolled in 1.20-100 mm (DD11-DD14, S235JR, S275JR, S355JR, S355MC-S700MC), pickled and oiled or unpickled. Coils are 100-1800 mm wide and weigh 4-24 t.
Two types of material are on offer. Mill overruns (excess prime) and overproduction are defect-free surplus from the mills, priced lower because they are sold without a mill certificate. Non-prime (second-grade) sheet has defects but is suitable for production, and the customer assesses whether it fits their own process. We accept orders from 5 t, with delivery across Europe. On request, a partner service centre cuts coils into sheets or strips; whole coils can also be collected.
How we can help
Winter purchase planning is easier to base on a specific specification than on general market quotes. Please send us your specification: sheet type, grade, thickness, width, coating, form (coil, strip, sheet), quantity in tonnes and delivery location. We will check availability, advise on possible alternatives and quote the batch. The full range of grades, coatings and formats is presented in the HEN-STOL steel sheet offer, with separate pages on galvanised sheet, cold-rolled sheet and hot-rolled sheet.
Frequently asked questions
What is the price of steel per tonne in October 2026?
In mid-October, hot-rolled sheet in Northern Europe cost 745 EUR/t ex-works (Fastmarkets index, 15.10.2026), cold-rolled around 850-860 EUR/t and galvanised 840-850 EUR/t in transactions. The CRC and HDG prices come from SteelOrbis, dated 16 October. Compared with the end of September, levels are similar. Data for the whole of October is not yet available.
Will steel prices fall in winter 2026/2027?
Mid-October data does not point to a clear decline. According to market sources, some mills have almost filled their Q4 order books, several plants in Italy are idle and import quotas in the key categories are exhausted until the end of the year. On the other hand, weak demand and high stocks at buyers are limiting increases. Prices have been moving sideways for several weeks.
Which steel import quotas were exhausted in Q4 2026?
According to European Commission data, by 6 October the exhausted quotas included the “other countries” pools for HRC, CRC and category 4A galvanised sheet, Turkey's HRC quota (160,573 t) and the Japan and Taiwan quotas for HDG 4A. Imports above the quota are subject to a 50% duty. Quota allocation from 1 January 2027 requires a new Commission implementing act.
What documents does the melt and pour rule require?
Since 1 October 2026, importers have had to state the country where the steel was melted and poured. The basis is the mill test certificate showing the country of melt and the heat number. Until 30 September 2027, customs may accept other documents instead, such as invoices, supplier declarations or customs documents from the exporting country, but they verify them. Without evidence, the goods will be refused.
How much does a CBAM certificate cost in 2026?
The European Commission set the CBAM certificate price at 75.36 EUR for Q1, 75.28 EUR for Q2 and 82.32 EUR for Q3 2026, per tonne of CO₂. The Q4 price will be published on 4 January 2027. Certificates will be available for purchase from February 2027, and from 2027 prices will be announced weekly.
How has steel demand changed in Europe and Poland?
In its report of 12 October 2026, worldsteel forecasts a 0.3% fall in EU steel consumption in 2026 and 3.1% growth in 2027. In Poland, the manufacturing PMI stood at 49.0 points in September, against 48.3 points in August. That still means falling activity, but at a slower pace, and companies increased their stocks of materials for the second month in a row.
Sources
- EUROMETAL (via Fastmarkets, SteelOrbis, S&P Global Platts and Kallanish), price assessments and market analysis for flat steel in Europe, 4-17 October 2026
- World Steel Association, Short Range Outlook October 2026, 2026
- European Commission, Regulation (EU) 2026/1384, Implementing Regulation (EU) 2026/1963 and Price of CBAM certificates, 2026
- S&P Global, Poland Manufacturing PMI, September 2026
- McCloskey by OPIS, European coil and green steel round-up, 25.09.2026